Can You Get New Floors Before the Holidays? A Realistic Timeline

November 13, 2026

Can You Get New Floors Before the Holidays? A Realistic Timeline

Every November, we get calls from homeowners hoping to have new floors in before family arrives. Sometimes that is very doable, and sometimes it is better to plan for January. Here is how the timeline usually works so you can make the call with clear expectations.

Step One: Measure and Quote

Everything starts with an in-home visit. We measure each room, look at the subfloor, check transitions and stairs, and bring samples so you can see them in your own light. You get a written quote, and once you approve it, materials are ordered. If you have already narrowed down your choices, this part moves quickly.

Step Two: Materials and Acclimation

Some products are in stock locally and others need to be ordered, which can add time. Wood also needs to acclimate to your home before it is installed, which is especially important along the Front Range where indoor air gets very dry once the furnace is running. Rushing acclimation is one of the most common causes of gaps and movement later, so it is not a step we skip to hit a date.

Waterproof vinyl and laminate are typically less sensitive than solid wood, but they still benefit from sitting in the home at normal living temperatures before installation, as the manufacturer recommends. We plan delivery so materials are in the house ahead of install day.

Step Three: Prep and Install Days

Removal of the old floor, subfloor repairs, and leveling all happen before the new floor goes down. Our floor demolition and prep work is often what decides whether a job takes one day or several. A floating floor in a few rooms can move quickly once prep is done. Hardwood installs and larger open areas take longer. Stairs add time because each step is fitted individually.

Making the Holiday Call

  • If you want floors in before a specific date, reach out as early as possible.
  • Choose products that are readily available if timing is the top priority.
  • Consider phasing: do the main living and dining area now and bedrooms later.
  • Leave a buffer of a few days between install and your first big gathering.

If the timeline is tight, we will tell you honestly. It is far better to host on your current floors and install in January than to rush a job. Our post on what to expect during your flooring project walks through the process in more detail, and our prep guide covers getting the house ready.

Hoping to host on new floors? Let's see what your timeline allows.

Schedule your free in-home estimate

Request a consultation

Meet with one of our skilled project specialists to get started

Featured Brands & Technologies

COREtec Floors
Dreamweaver
Mannington
Mohawk
MSI
Phenix
Quickstep
Shaw Floors
Smartstrand
SolidTech
Stanton
USfloors
American Olean
Daltile